Show HN: Tetris in a PDF(th0mas.nl)
1193 points by ThomasRinsma | 211 comments
A PDF file that runs a playable Tetris game using JavaScript and form-field annotations supported by browser PDF engines like PDFium and PDF.js.
Stories posted this day, by points. Rank history starts with the October 2026 rebuild.
1193 points by ThomasRinsma | 211 comments
A PDF file that runs a playable Tetris game using JavaScript and form-field annotations supported by browser PDF engines like PDFium and PDF.js.
745 points by OsrsNeedsf2P | 542 comments
Substack post by Evan Carroll about Stack Overflow and Stack Exchange renaming or erasing Luigi Mangione's account, framed as tech serving the ruling class.
505 points by pncnmnp | 137 comments
Part 9 of a blog series on upgrading the Chumby 8's Linux kernel from 2.6.28 to 6.x, investigating why top always reports 100% CPU usage.
501 points by dxs | 279 comments
Charles Hugh Smith blog post arguing that widespread burnout is being masked by play-acted solutions and narrative control.
419 points by piebro | 91 comments
GitHub repository for a tool and web demo that artfully visualizes Factorio blueprints, updated for Factorio 2.0 and Space Age.
359 points by Kerrick | 153 comments
Steve Hanov's 2012 blog post arguing that a short epsilon-greedy multi-armed bandit algorithm outperforms traditional A/B testing.
342 points by notmine1337 | 126 comments
Orange Tsai's blog post presenting WorstFit, a class of Windows vulnerabilities arising from Best-Fit character conversion between UTF-16 and ANSI code pages.
265 points by lrx | 94 comments
258 points by eadz | 117 comments
186 points by subomi | 232 comments
173 points by zdw | 81 comments
122 points by bhpreece | 141 comments
106 points by tomcam | 41 comments
101 points by jicea | 31 comments
87 points by lwhsiao | 23 comments
86 points by Openai2 | 127 comments
75 points by ksec | 37 comments
62 points by OuterVale | 39 comments
50 points by logikblok | 26 comments
43 points by nurandal | 12 comments
28 points by srvaroa | 35 comments
22 points by testelastic | 2 comments