Looks similar
Bitcoin puzzle #66 was solved: 6.6 BTC (~$400k) withdrawn(blockchain.com)
406 points by mrb | 344 comments
Blockchain.com explorer page for the Bitcoin puzzle #66 address, showing 6.6 BTC received and fully withdrawn, leaving a zero balance.
Five Qwen3.8-27B models match Fable 5 Using GVS5H Harness(github.com)
160 points by rzk | 56 comments
GitHub repo with code and paper for GVS5H, a training-free self-orchestration harness letting Qwen3.8-27B instances match Claude Fable 5 on hard LiveCodeBench problems.
Every V4 UUID(everyuuid.com)
1334 points by LorenDB | 351 comments
A novelty website by eieio that lists every possible version 4 UUID in a scrollable, searchable list with copy and favorite buttons.






